Skip to main content

How we work

Six stages, one senior team, from first call to live product. Here's exactly how an engagement runs.

One path from idea to a product that keeps running

Six stages, one senior team. The same path whether you start from a blank repo or a product that already ships.

A six-stage timeline from idea to a product that keeps running. Discovery pins down the problem, users and scope. MVP scoping chooses the smallest thing that ships. Design works out flows and states before code. Development ships vertical slices with tests as they go. Deployment adds CI, observability and runbooks. Ongoing means the product is owned after launch rather than handed off.
Every stage ends in something you can inspect, not a status call.

From first call to live product

The same path from idea to production, whether you start from a blank repo or a product that already ships. Each stage lists a rough timeline and a next step.

New product. We start here.

Typical engagement · 8 to 14 weeks end to end

  1. Discovery

    1–2 weeks

    We map the product with you: user flows, scope, and the riskiest assumptions, before anyone writes code. You leave knowing what to build first.

    Book a discovery sprint
  2. MVP scoping

    1 week

    We cut the roadmap to the smallest launch worth shipping, priced and sequenced, so the first release earns feedback instead of burning runway.

    Estimate my build
  3. Design

    1–3 weeks

    Wireframes, a design system, and a clickable prototype, built alongside engineering so what you approve is what ships.

    See our design approach
  4. Development

    4–10 weeks

    Two-week sprints, weekly demo Looms, and CI/CD from day one. You watch it come together in your own Slack, not at a big reveal.

    How we build
  5. Deployment

    3–5 days

    We ship to your infrastructure with load tests, a security pass, and monitoring in place. Launch day stays boring.

    Our deploy stack
  6. Version & future

    Ongoing

    After launch we iterate on real usage: new features, performance, and scale, on a retainer sized to your roadmap.

    Explore a retainer

What you receive

Three deliverables you can inspect along the way, from the first call to launch day.

Product brief and roadmap
Discovery closes with a scoped roadmap and a fixed-price quote, so scope is agreed before anyone writes code.
Working prototype
Design closes with a clickable prototype and an asset library, built alongside engineering so what you approve is what ships.
Release checklist
Launch and handoff close with a live product and an ops runbook, after load testing and a security review.

Discovery

Scoped roadmap + fixed-price quote.

Activities

  • Architecture review
  • User-flow mapping
  • Risk register
  • Scoped roadmap

Deliverable

Roadmap doc + fixed-price quote.

Team

PM + senior engineer + designer.

Design

Wireframes, design system, and clickable prototype, parallel-tracked.

Activities

  • Wireframes
  • Design-system audit
  • Figma file
  • Clickable prototype

Deliverable

Clickable prototype + asset library.

Team

Designer + senior engineer (technical review).

Build

Two-week sprints, weekly demo Looms, daily standups.

Activities

  • Two-week sprints
  • Weekly demo Loom
  • Daily standups in client Slack
  • CI/CD from week 1

Deliverable

Production-ready application deployed to client infrastructure.

Team

Full Project Build team (Tech Lead + engineers + PM + QA).

Launch + handoff

Load test, security review, docs, optional retainer.

Activities

  • Load testing
  • Security review
  • Documentation handoff

Deliverable

Live product + ops runbook + 30-day support + optional retainer transition.

Team

Tech Lead + DevOps + PM.

A week in the build

The rhythm of a typical build week, so you always know when to expect an update.

Monday
Weekly planning: the week's priorities are agreed with your PM, then the build picks up.
Tuesday to Thursday
Build: features ship as vertical slices with tests, CI/CD running from week one.
Friday
Weekly demo: a Loom walks through what shipped, with release notes and next steps.
Daily
Standup in your Slack, with a 24-hour response on anything critical.
Monthly
CEO check-in to review progress and anything that needs a decision.

Stack and infrastructure

Every stage runs on tools picked for reliability, not fads. The stack stays consistent from discovery through launch so nothing gets lost in translation.

What stays consistent

01

Communication cadence

Weekly demo Loom every Friday, daily standup in your Slack, monthly CEO check-in, and a 24-hour response on anything critical.

Schedule a meeting
02

Senior engineering presence

Senior engineers on every project, a second-senior peer review on every PR, and a Tech Lead who reports to you weekly.

Schedule a meeting
03

Quality standards

TypeScript strict mode, enforced test-coverage thresholds, measured Lighthouse scores, and a security scan before every release.

Schedule a meeting

Frequently asked questions

  • Roughly 8–14 weeks end to end: 1–2 weeks Discovery, then a 6–10 week build phase, plus 1–2 weeks for launch and handoff.

See the process in action

Most engagements start with a Discovery Sprint: 1–2 weeks that end in a scoped roadmap and a fixed-price quote.